• The login component features highly-secure protection measures to safeguard your personal information. Your login credentials are transmitted securely using SSL protocol encryption. This is true even though you do not see "https" in the URL, or a lock icon on the bottom of the browser window. If you require additional assistance, please email us at info@numetrics.com

    Numetrics application is temporarily unavailable due to system maintenance.
    Normal operations will be restored by 10:20 PM PST 02-Mar-10.
     
    Enter your personal login to access Numetrics' customer area*
     
       
    * Login name and Passwords are case sensitive
    Forgot your password Security Concerns?
    Don't have a login name? Contact Us
    • Home
    •  
    • Solutions
    •  
    • Products
    •  
    • Services
    •  
    • Consulting
    •  
    • About Us
    •  
    • Library
    • Feedback

    Categories

    • Best Practices
    • Case Studies
    • Customer Testimonials
    • Industry Database
    • News
    • Productivity
    • Products
    • Project Planning
    • Risk Analysis
    • Schedule Predictability

    Recent Articles

    • How productive is your R&D organization?
    • The Brewing Innovation Storm
    • Doing Moore with Less
    • Sleepless in San Jose
    • DVCon and the Design Productivity Crisis
    • Lessons from The Checklist Manifesto

    Archive

    • June 2010
    • May 2010
    • April 2010
    • March 2010
    • February 2010
    • January 2010
    • December 2009
    • November 2009
    • October 2009
    • September 2009
    • August 2009
    • June 2009
    • May 2009
    • April 2009
    • March 2009
    • February 2009
    • January 2009

    Tags

      cores design reuse EDA EE Times ERP software fact-based planning IC development productivity ip ip cores Jasper Design Automation Kathryn Kranen new product development Numetrics Planning planning software product development Productivity project management software Risk Analysis risk assessment risk management Ron Collett Schedule Schedule Predictability semiconductor semiconductor design semiconductors SOC software design system-on-chip

    Blogroll

    • A Conversation on Innovation (Sanjay Srivastava)
    • Daniel Nenni's Silicon Valley Blog
    • EE Times News
    • Harry the ASIC Guy (Harry Gries)
    • Industry Insights (Richard Goering)
    • JB's Circuit (John Blyler)
    • Leibson's Law (Steve Leibson)
    • Low-power Design.com (John Donovan)
    • Practical Chip Design (Ron Wilson)
    • The World is Analog (Mike Demler)

    Archive for August, 2009

    Re-Planning semiconductor design projects effectively

    by Numetrics | August 3, 2009 | In Best Practices, Products, Project Planning, Risk Analysis | No Comments

    Summary: Re-planning a semiconductor design project is often inevitable as the program is underway. The key to effective, productive re-planning lies in understanding complexity, schedule and resources.

    Change is inevitable. Economic factors, mergers and acquisitions, customer specification changes, management and strategy changes all affect project planning and execution. These factors create a need for re-planning IC projects while they are ongoing.

    The key to re-planning is the same as for the original planning process: an understanding of complexity, schedule and resources. Numetrics’ NMX-ERP can capture not only the starting characteristics of your design, but also updates as work is completed. This means that at any point during the design, you can calculate the work remaining and the resource and/or schedule implications of that.

    Re-planning is simply a process of updating the assumptions based on new information. From there it is a simple process to re-run the analysis, and to generate a new plan. This is easy not only because there is explicit support in the tools for re-planning and the management of multiple scenarios for a single design, but also because there is no need for data re-entry. Everything is built from the original plan, saving a great deal of time for your planners.

    Schedule Risk Analyzer generates a comprehensive set of reports that quantitatively assess the underlying schedule risk, given the design’s complexity, staffing assigned to the project and target cycle-time.

    Schedule Risk Analyzer generates a comprehensive set of reports that quantitatively assess the underlying schedule risk, given the design’s complexity, staffing assigned to the project and target cycle-time.

    The real implication of the re-planning capability is that when a change is proposed, you can quickly determine feasibility. For example, if marketing comes to you and says, “We need samples six weeks early for a key customer,” you can rapidly tell them what that means for resources. If additional resources are not available, you might consider scaling back product features to meet the new schedule. Alternatively, you may be forced to complete the design with fewer engineers than you had originally planned for. In such a case, you can quickly determine the best way to meet your business objectives with the new constraint—either reducing the feature set, or planning for a managed schedule slip.

    The net benefit of Numetrics’ re-planning tools is fact-based decision-making in a time of stress. Fact-based planning improves the quality of internal decisions, leading to a healthier business and happier employees. And that can’t be bad.

     