• The login component features highly-secure protection measures to safeguard your personal information. Your login credentials are transmitted securely using SSL protocol encryption. This is true even though you do not see "https" in the URL, or a lock icon on the bottom of the browser window. If you require additional assistance, please email us at info@numetrics.com

    Numetrics application is temporarily unavailable due to system maintenance.
    Normal operations will be restored by 10:20 PM PST 02-Mar-10.
     
    Enter your personal login to access Numetrics' customer area*
     
       
    * Login name and Passwords are case sensitive
    Forgot your password Security Concerns?
    Don't have a login name? Contact Us
    • Home
    •  
    • Solutions
    •  
    • Products
    •  
    • Services
    •  
    • Consulting
    •  
    • About Us
    •  
    • Library
    • Feedback

    Categories

    • Best Practices
    • Case Studies
    • Customer Testimonials
    • Industry Database
    • News
    • Productivity
    • Products
    • Project Planning
    • Risk Analysis
    • Schedule Predictability

    Recent Articles

    • How productive is your R&D organization?
    • The Brewing Innovation Storm
    • Doing Moore with Less
    • Sleepless in San Jose
    • DVCon and the Design Productivity Crisis
    • Lessons from The Checklist Manifesto

    Archive

    • June 2010
    • May 2010
    • April 2010
    • March 2010
    • February 2010
    • January 2010
    • December 2009
    • November 2009
    • October 2009
    • September 2009
    • August 2009
    • June 2009
    • May 2009
    • April 2009
    • March 2009
    • February 2009
    • January 2009

    Tags

      cores design reuse EDA EE Times ERP software fact-based planning IC development productivity ip ip cores Jasper Design Automation Kathryn Kranen new product development Numetrics Planning planning software product development Productivity project management software Risk Analysis risk assessment risk management Ron Collett Schedule Schedule Predictability semiconductor semiconductor design semiconductors SOC software design system-on-chip

    Blogroll

    • A Conversation on Innovation (Sanjay Srivastava)
    • Daniel Nenni's Silicon Valley Blog
    • EE Times News
    • Harry the ASIC Guy (Harry Gries)
    • Industry Insights (Richard Goering)
    • JB's Circuit (John Blyler)
    • Leibson's Law (Steve Leibson)
    • Low-power Design.com (John Donovan)
    • Practical Chip Design (Ron Wilson)
    • The World is Analog (Mike Demler)

    Archive for March, 2009

    Effective what-if scenario analysis for IC development projects

    by Numetrics | March 17, 2009 | In Best Practices, Industry Database, Products, Project Planning, Risk Analysis, Schedule Predictability | No Comments

    Summary: Comparing the specifics of your semiconductor design with industry and company history enables insightful what-if scenario analysis to help manage development programs effectively .

    During the planning stages for a chip design, there are a number of variables that can be tweaked in the creation of the final product plan. We can reduce or expand the feature set for a new device. We can reduce or extend the schedule. And we can reduce or increase the number of full-time-equivalent (FTE) staff allocated to the project. By manipulating these variables, we can negotiate a plan between the different stakeholders. In some cases, resources are the limiting factor. In others, the schedule is non-negotiable (for example a lot of consumer products must be ready for CES).

    Running a lot of plans against all these variables has historically been difficult and time-consuming. In addition, the results have always been subject to arguments because there has been no trusted model to relate complexity, resources and schedule. Numetrics changes all that. By tweaking resource, schedule or feature set (complexity) assumptions, NMX-ERP can rapidly generate graphs that show the feasibility of each plan, and compare it with company and industry norms using their proprietary complexity engine and plan synthesizer.

    The speed and defensibility of these analyses lends them great power. It is not rational to assume productivity or schedules that are significantly different from past performance, so any feasible plan must lie close to the lessons of history. There is a cost to adding features, or to shrinking the schedule, or to reducing headcount. The most effective way to negotiate these choices is with the aid of an objective toolset that combines the specifics of your design and plan with industry and company history. The tool is fast enough that you can run tens or even hundreds of plans in minutes or hours. From these scenarios you can then pick the plan that best meets your business goals.

     
  • Copyright © 2010 Numetrics Management Systems, Inc. All rights reserved